20Jul


Be sure to view our picture and video gallery @ www.osinstallations.com Installation of 418 sq ft of Engineered Hardwood Flooring to include transitions and shoemold.

You can leave a response, or trackback from your own site.

3 Responses to “Engineered Hardwood Flooring – Finished Walk-Thru”

  1. Theflooringguy1 says:

    The reason for the quarter round is used because base board needs to be installed level, having said that , most floors are not level which will leave a gap between the new floor and the baseboard. This is where the qtr/rnd needs to be used. Installing the qtr/rnd flush to the floor esures no gaps

  2. demellousa says:

    look great!!

  3. stymye says:

    if you had removed the base board you wouldn’t have had to install the godawfull quarter round.
    quarter round along the walls went out of vogue a long time ago
    all that aside,the floors look great !

Leave a Reply

*